Hostname: page-component-cd9895bd7-mkpzs Total loading time: 0 Render date: 2024-12-25T09:13:58.207Z Has data issue: false hasContentIssue false

Production scheduling and operational control of flexible manufacturing systems

Published online by Cambridge University Press:  09 March 2009

M. Bonfioli
Affiliation:
Department of Mechanical Engineering, Politecnico di Milano, Milan (Italy)
M. Garetti
Affiliation:
Department of Mechanical Engineering, Politecnico di Milano, Milan (Italy)
A. Pozzetti
Affiliation:
Department of Mechanical Engineering, Politecnico di Milano, Milan (Italy)

Abstract

SUMMARY

Only hardware and software flexibility combined can yield the overall system flexibility required in newly designed FMSs in which the expected part mix is quite large and continually changing.

The paper shows how modular design and integration are fundamental steps in software design for the management and control of FMSs. The main subsystems of a control system, built up by putting together a number of standardized modules requiring little or no customization, are also described. An experimental control system designed according to these criteria is also presented.

Type
Articles
Copyright
Copyright © Cambridge University Press 1985

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

1.Jablonowski, J., “Aiming for Flexibility in Manufacturing Systems” American Machinist, Special Report 720 (03, 1980).Google Scholar
2.Shaffer, G.H., “Implementing CIM” American Machinist, Special Report 736 (08, 1981).Google Scholar
3.“CAM an International comparison” American Machinist, Special Report 740 (11, 1981).Google Scholar
4.Bjorke, O., “Computer Aided Part ManufacturingComputers in Industry 1, No. 1 (1979).CrossRefGoogle Scholar
5.Stute, G., “State of the Art of Flexible Manufacturing Systems”, Machine Tool Task Force, Technology of Machine Tools (Lawrence Laboratory, vol. 2, 10 1980).Google Scholar
6.Browne, J., Dubois, D., Rathmill, K., Sethi, S.P. & Stecke, K.E., “Classification of Flexible Manufacturing Systems” The FMS Magazine (04, 1984).Google Scholar
7.Buzacott, J.A., “The Fundamental Principles of Flexibility in Manufacturing Systems” 1st Int. Conf. on FMS, Brighton (10, 1982).Google Scholar
8.Turco, F. and Noě, C., “Lo stato della tecnologia nelli industria manifatturicra meccanica di fronte all' automazione flessibile” ricerca Mediocredito Lombardo-Politecnico di Milano.Google Scholar
9.Bullinger, H.J. and Lentes, H.P., “The Future of Work. Technological, Economic and Social ChangesIntern. J. Prod. Res 20, No. 3 (1982).CrossRefGoogle Scholar
10.Colding, B., Colwell, L.V. and Smith, D.N., “DELPHI Forecast of Manufacturing Technology. Manufacturing Systems. Material Removal” SME (05, 1977).Google Scholar
11.Burgam, P., “FMS Control: Covering All the AnglesCAD/CAM Technology 3, No. 2 (1984).Google Scholar
12.Garetti, M., “MCCS-Progetto del Software di Controllo di una Cellula Flessibile di Produzione” Pixel No. 6 (1981).Google Scholar
13.Falster, P. and Rolstadas, A., “The Integration of Production Management and Flexible Manufacturing” Advances in CAD/CAM (North Holland Publishing Company, Amsterdam, 1983).Google Scholar
14.Costa, A. and Garetti, M., “Design of a control system for a flexible manufacturing cell” (To appear in the J. Manuf. Systems, SME).Google Scholar
15.Nof, S.Y., Barash, M.M. and Solberg, J.J., “Operational Control of Item Flow in Versatile Manufacturing Systems”, Intern. J. Prod. Res. 17, No. 5 (1979).CrossRefGoogle Scholar
16.Haider, S.W., Moodie, C.L. and Buck, J.R., “An Investigation of the Advantages of Using a Man-Computer Interactive Scheduling Methodology for Job-ShopsIntern. J. Prod. Res. 19, No. 4 (1981).CrossRefGoogle Scholar
17.Bell, R. and Bilalis, N., “Loading and Control Strategies for an FMS for Rotational Parts” 1st Int. Conf. on FMS (10, 1982).Google Scholar
18.Blackstone, J.H., Phillips, D.T. and Hogg, G.L., “A State of the Art Survey of Dispatching Rules for Manufacturing Job Shop OperationsIntern. J. Prod. Res. 20, No. 1 (1982).CrossRefGoogle Scholar
19.Iwata, K., Murotsu, A., Oba, F. and Yasuda, K., “Production Scheduling of Flexible Manufacturing SystemsAnnals of the CIRP 31, No. 1 (1982).CrossRefGoogle Scholar
20.Stecke, K.E. and Solberg, J.J., “Loading and Control Policies for a Flexible Manufacturing SystemIntern. J. Prod. Res. 19, No. 5 (1981).CrossRefGoogle Scholar
21.Brandolese, A., “La Programmazione della Produzione nei Sistemi Flessibili di Lavorazione” Pixel No. 3 (1982).Google Scholar
22.Schlauch, R., “Production Scheduling in a Flexible Manufacturing System (FMS)” 1st Int. Conf. on FMS, Brighton, (10, 1982).Google Scholar
23.Foo, F.C. and Wager, J.G., “Set-Up Times in Cyclic and Acyclic Group Technology Scheduling SystemsIntern. J. Prod. Res. 21, No. 1 (1983).Google Scholar
24.Garetti, M., “Criteri di Progetto del Sistema di Controllo di Sistemi Flessibili di Produzione” 4 Congresso Nazionale DECUS ITALIA (05, 1983).Google Scholar
25.Manara, R., Giuffre, O.' and Cavagnaro, F., “A Generalized Approach to the Problem of FMS On-Line Management” 1st Int. Conf. on FMS, Brighton (10, 1982).Google Scholar
26.Arai, Y., Hata, S., Imakubo, T. and Kikuchi, K., “Production Control System of Microcomputers Hierarchical Structure for FMS” 1st Int. Conf. on FMS, Brighton (10, 1982).Google Scholar
27.Nof, S.Y., Whinston, A.B. and Bullers, W.Y., “Control and Decision Support in Automatic Manufacturing SystemsAIEE Trans. 12, No. 2 (06, 1980).Google Scholar
28.Bullers, W.I., Whinston, S.Y.Nof A.B., “Artificial Intelligence in Manufacturing Planning and Control AIEE Trans. 12, No. 4 (10, 1980).Google Scholar
29.Garetti, M., “Il Sistema SCAMP” Pixel No. 3 (1983).Google Scholar
30.Brandolese, A. and Garetti, M., “FMS Control Systems: Design Criteria and Performance Analysis” 2nd Int. Conf. on FMS, London (10, 1983).Google Scholar