Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Zijm, Henk
and
Van Houtum, Geert-Jan
1994.
On multi-stage production/inventory systems under stochastic demand.
International Journal of Production Economics,
Vol. 35,
Issue. 1-3,
p.
391.
Adan, Ivo
van Eenige, Michel
and
Resing, Jacques
1995.
Fitting Discrete Distributions on the First Two Moments.
Probability in the Engineering and Informational Sciences,
Vol. 9,
Issue. 4,
p.
623.
van Houtum, G.J.
Inderfurth, K.
and
Zijm, W.H.M.
1996.
Materials coordination in stochastic multi-echelon systems.
European Journal of Operational Research,
Vol. 95,
Issue. 1,
p.
1.
Adan, Ivo
and
Zhao, Yiqiang
1996.
Analyzing GI/Er/1 queues.
Operations Research Letters,
Vol. 19,
Issue. 4,
p.
183.
Diks, E. B.
and
van der Heijden, M. C.
1997.
Modeling Stochastic Lead Times in Multi-Echelon Systems.
Probability in the Engineering and Informational Sciences,
Vol. 11,
Issue. 4,
p.
469.
Janssen, Fred
and
de Kok, Ton
1999.
A two-supplier inventory model.
International Journal of Production Economics,
Vol. 59,
Issue. 1-3,
p.
395.
de Kok, Ton G.
2000.
Capacity allocation and outsourcing in a process industry.
International Journal of Production Economics,
Vol. 68,
Issue. 3,
p.
229.
Inderfurth, K.
de Kok, A.G.
and
Flapper, S.D.P.
2001.
Product recovery in stochastic remanufacturing systems with multiple reuse options.
European Journal of Operational Research,
Vol. 133,
Issue. 1,
p.
130.
Alfa, Attahiru Sule
2002.
Discrete time queues and matrix-analytic methods.
Top,
Vol. 10,
Issue. 2,
p.
147.
Missbauer, H.
2002.
Aggregate order release planning for time-varying demand.
International Journal of Production Research,
Vol. 40,
Issue. 3,
p.
699.
de Kok, Ton G.
and
Fransoo, Jan C.
2003.
Supply Chain Management: Design, Coordination and Operation.
Vol. 11,
Issue. ,
p.
597.
Swaminathan, Jayashankar M.
and
Tayur, Sridhar R.
2003.
Supply Chain Management: Design, Coordination and Operation.
Vol. 11,
Issue. ,
p.
423.
Van Nyen, Pieter L.M
Van Ooijen, Henny P.G
and
Bertrand, J.Will M
2004.
Simulation results on the performance of Albin and Whitt's estimation method for waiting times in integrated production–inventory systems.
International Journal of Production Economics,
Vol. 90,
Issue. 2,
p.
237.
de Smidt-Destombes, Karin S.
C. van der Heijden, Matthieu
and
van Harten, Aart
2004.
On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy.
Reliability Engineering & System Safety,
Vol. 83,
Issue. 3,
p.
287.
Wagner, Michael
and
Smits, Sanne R
2004.
A local search algorithm for the optimization of the stochastic economic lot scheduling problem.
International Journal of Production Economics,
Vol. 90,
Issue. 3,
p.
391.
Smits, Sanne R.
Adan, Ivo
and
de Kok, Ton G.
2004.
WAITING TIME CHARACTERISTICS IN CYCLIC QUEUES.
Probability in the Engineering and Informational Sciences,
Vol. 18,
Issue. 03,
Smits, Sanne R
Wagner, Michael
and
G. de Kok, Ton
2004.
Determination of an order-up-to policy in the stochastic economic lot scheduling model.
International Journal of Production Economics,
Vol. 90,
Issue. 3,
p.
377.
de Smidt-Destombes, Karin S.
van der Heijden, Matthieu C.
and
van Harten, Aart
2006.
On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out.
European Journal of Operational Research,
Vol. 174,
Issue. 1,
p.
182.
de Smidt-Destombes, Karin S.
van der Heijden, Matthieu C.
and
van Harten, Aart
2007.
Availability of -out-of- systems under block replacement sharing limited spares and repair capacity.
International Journal of Production Economics,
Vol. 107,
Issue. 2,
p.
404.
Desmet, B.
Aghezzaf, E.-H.
and
Vanmaele, H.
2010.
Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management.
p.
367.