Hostname: page-component-78c5997874-lj6df Total loading time: 0 Render date: 2024-11-19T04:22:52.349Z Has data issue: false hasContentIssue false

State-of-the-art and proof-of-concept installations for repository concepts based in crystalline rock

Published online by Cambridge University Press:  02 January 2018

Magnus Kronberg*
Affiliation:
Swedish Nuclear Fuel andWaste Management Co (SKB), Äspölaboratoriet, Box 929, 572 29 Oskarshamn, Sweden
Jan Gugala
Affiliation:
Swedish Nuclear Fuel andWaste Management Co (SKB), Äspölaboratoriet, Box 929, 572 29 Oskarshamn, Sweden
Keijo Haapala
Affiliation:
Posiva Oy, Olkiluoto, FI-27160 Eurajoki, Finland
*
Rights & Permissions [Opens in a new window]

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the ‘Save PDF’ action button.

Over the last five decades private and national energy programmes worldwide have been producing a variety of radioactive wastes. One of the safest ways of disposing of this waste is to bury it deep underground in purpose-built geological disposal facilities. Currently, there is no operating geological repository in Europe for high-level waste but the goal of the IGD-TP is that the first repository shall be fully operational before the year 2025. Several studies and experiments are ongoing at various potential repository sites in Europe with the goal to establish general approaches that can be adapted for any country in need of a geological repository.

The Swedish Nuclear Fuel and Waste Management Co (SKB) in Sweden and Posiva Oy in Finland are developing a method for geological disposal of high-level long-lived nuclear waste in crystalline rock, the KBS-3 method. KBS-3V (vertical) is both organizations reference design, but KBS-3H (horizontal) emplacement is also being researched as a potential alternative. Of high importance in the development is demonstrating the technical feasibility in situ of safe and reliable construction, manufacturing, disposal and sealing of such geological disposal facilities. Parts of these demonstrations are carried out under the framework of EurAtom/FP7 and one of these projects is the LUCOEX project where SKB is demonstrating horizontal emplacement, the Multi Purpose Test (MPT), and Posiva is demonstrating vertical buffer installation processes.

The MPT includes the key components of the horizontal design and comprises all essential steps; manufacturing of the full-scale components, their assembly, installation in the drift and monitoring of the early buffer evolution. The MPT installation was successfully performed in late 2013. By combining the components, an initial verification of the design implementation has been achieved. At the same time, integrating the components has meant the recognition of some design weaknesses and the design will be updated accordingly.

Posiva's KBS-3V buffer installation equipment that places buffer blocks with high precision in vertical deposition holes is currently being developed and will be tested during 2014 and 2015 in real underground conditions. The machine uses vacuum lifting tools for moving the buffer blocks and laser scanning technology to position both the machine and blocks. Functionality of the concept and equipment selected will be confirmed by the tests and the installation tests will provide important information about the suitability of the selected buffer dimensions and tolerances.

Type
Research Article
Creative Commons
Creative Common License - CCCreative Common License - BY
Copyright © The Mineralogical Society of Great Britain and Ireland 2015. This is an open access article, distributed under the terms of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright
Copyright © The Mineralogical Society of Great Britain and Ireland 2015

References

Bäckblom, G. and Lindgren, E. (2005) KBS-3H -Excavation of two horizontal drifts at the Äspö Hard Rock Laboratory during year 2004—2005. Work description, summary of results and experience. Report no. R-05-4. Swedish Nuclear Fuel and Waste management Co. Stockholm. http://www.skb.se/publication/1052868/ Google Scholar
IGD-TP (2011) Strategic Research Agenda 2011. Implementing Geological Disposal of Radioactive Waste Technology Platform [IGD-TP]. http://www.igdtp.eu/index.php/documents/cat_view/3-igd-tp-key-documents Google Scholar
Johannesson, L.-E. (2002) Äspö Hard Rock Laboratory. Manufacturing of bentonite buffer for the prototype repository. Report no. SKB IPR-02-19. Swedish Nuclear Fuel and Waste management Co. Stockholm. http://www.skb.se/upload/publications/pdf/ipr-02-19.pdf Google Scholar
Johannesson, L.-E., (2014) Manufacturing of buffer and filling components for the Multi Purpose Test. Deliverable D4:01. LUCOEX. http://lucoex.eu/files/D0401.pdf Google Scholar
Ojala, M. and Von Numers, T. (2014) Deposition machine upgrades during the Multi Purpose Test. LUCOEX Working Report P-14-08 KBS-3H D 4.2. Deliverable D4:02. http://lucoex.eu/files/D0402.pdf Google Scholar
SKB (2012) KBS-3H Complementary studies, 2008-2010. Technical Report no. TR-12-01. Swedish Nuclear Fuel and Waste management Co. Stockholm http ://www. skb.se/up load/pub lications/pdf/TR-12-01. pdfGoogle Scholar
SKB (2013) RD&D Programme 2013. Programme for research, development and demonstration of methods for the management and disposal of nuclear waste. Technical Report no. TR-13-18. Swedish Nuclear Fuel and Waste management Co. Stockholm. http://www.skb.se/upload/publications/pdf/TR-13-18.pdf Google Scholar
Wiberg, A.C. (2014) Evaluation of how the LUCOEX results can be utilised by less-advanced programs. Deliverable D1:15. LUCOEX. http://lucoex.eu/files/D0115.pdf CrossRefGoogle Scholar