Hostname: page-component-78c5997874-ndw9j Total loading time: 0 Render date: 2024-11-20T03:42:43.129Z Has data issue: false hasContentIssue false

“Zero-defect” and ppm strategy for semi-finished steel products, bars and wire rod from the point of view of the steel manufacturers

Published online by Cambridge University Press:  25 October 2002

Get access

Abstract

This report, a conclusion of a VDEh working group, has the aim to show that a 100% inspection at a suitable stage of the whole production line is necessary to reach the “zero-defect”. This work should lead to a better understanding by the customers and steel consumers of the limits, which are achievable with the current techniques in connexion with the discussion about the “zero-defect”.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2002

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)