Hostname: page-component-586b7cd67f-t7czq Total loading time: 0 Render date: 2024-11-30T01:48:01.282Z Has data issue: false hasContentIssue false

Steelmaking developments in the pilot plant at Corus UK, R,D&T, Teesside Technology Centre

Published online by Cambridge University Press:  15 September 2007

Get access

Abstract

Key past pilot plant developments in steelmaking and continuous casting are reviewed. The enhanced facility at Teesside Technology Centre is outlined. This comprises an EAF which can tap up to 6.9 t, a combined LAF/tank degasser, vertical with bending caster and ingot casting facilities. The equipment and early commissioning during 2006 are described.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)