Hostname: page-component-cd9895bd7-mkpzs Total loading time: 0 Render date: 2024-12-24T13:51:10.248Z Has data issue: false hasContentIssue false

Extension of CST No. 1 blast furnace - hearth wear control

Published online by Cambridge University Press:  07 May 2004

Get access

Abstract

Blast furnace No. 1 of Companhia Siderúrgica de Tubarão has been in continuous operation for 20 years, accomplishing a high operational performance with high productivity and low fuel consumption. With a view to reach the major objective of 18,500 t/m3/IV of productivity, several works have been carried out in order to extend the furnace campaign until 2008. This paper presents the results of these activities along with a proposal for a new concept of hearth wear.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)