Crown control on the hot strip mill of Fos-sur-Mer
Published online by Cambridge University Press: 18 May 2005
Abstract
The hot strip mill of Arcelor in Fos has been revamped between February 2001 and July 2002. Positive/negative (±200 tons per side) bending actuators were installed on the four first stands of the finisher. This investment made it possible to further improve the geometry of the products (crown and thickness control), as well as the reliability and productivity of the HSM.