Hostname: page-component-586b7cd67f-t7fkt Total loading time: 0 Render date: 2024-11-30T01:56:27.711Z Has data issue: false hasContentIssue false

Blast furnace campaign prolongation philosophiesin Germany

Published online by Cambridge University Press:  12 June 2007

Get access

Abstract

To maximize furnace campaigns and to minimize production downtimesthrough short lining times, the entire integral blast furnacearea, including the auxiliary units, has to be theoretically partitioned.The evolution of measures for extending furnace life is in conjunctionwith the investigation and understanding of the in some respectsvery complicated wear mechanisms and their causes. Of mostimportance are the constructional, material and process engineeringmeasures to reduce wear and the measuring instrumentation forearly detection and progress monitoring of wear.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)