Hostname: page-component-cd9895bd7-gxg78 Total loading time: 0 Render date: 2024-12-24T13:34:43.347Z Has data issue: false hasContentIssue false

Application of the Hybrid Pelletized Sinter (HPS) process at Monlevade Works

Published online by Cambridge University Press:  06 April 2004

Get access

Abstract

Belgo-Mineira, Arcelor Group, has at Monlevade Works one sinterplant with 120 m2 of strand area and its own iron ore mine (Andrade mine). Aiming to increase sinter production combined with the use of 100% of its own iron ore, the Hybrid Pelletized Sinter (HPS) process, developed by JFE (former NKK), was chosen among other alternatives. The HPS process started up at Monlevade Works in December 2002 and since January 2003 100% of Andrade iron ore has been used at the sinterplant. The contractual sinterplant productivity target (42 t/m2.24h) has been achieved.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)