Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Kämpke, Thomas
1987.
Necessary optimality conditions for priority policies in stochastic weighted flowtime scheduling problems.
Advances in Applied Probability,
Vol. 19,
Issue. 3,
p.
749.
Weber, Richard R.
1988.
Stochastic Differential Systems, Stochastic Control Theory and Applications.
Vol. 10,
Issue. ,
p.
601.
Coffman, E.G.
Hofri, M.
and
Weiss, G.
1989.
Scheduling Stochastic Jobs with a Two-Point Distribution on Two Parallel Machines.
Probability in the Engineering and Informational Sciences,
Vol. 3,
Issue. 1,
p.
89.
Möhring, R.H.
and
Radermacher, F.J.
1989.
Advances in Project Scheduling.
p.
497.
Weiss, Gideon
1990.
Approximation results in parallel machnies stochastic scheduling.
Annals of Operations Research,
Vol. 26,
Issue. 1-4,
p.
195.
Righter, Rhonda
and
Xu, Susan H.
1991.
Scheduling jobs on non-identical IFR processors to minimize general cost functions.
Advances in Applied Probability,
Vol. 23,
Issue. 4,
p.
909.
Righter, Rhonda
and
XU, Susan
1991.
Scheduling jobs on heterogeneous processors.
Annals of Operations Research,
Vol. 29,
Issue. 1,
p.
587.
Chang, Cheng-Shang
Nelson, Randolph
and
Pinedo, Michael
1991.
Scheduling two classes of exponential jobs on parallel processors: structural results and worst-case analysis.
Advances in Applied Probability,
Vol. 23,
Issue. 4,
p.
925.
Chang, Cheng-Shang
1992.
A new ordering for stochastic majorization: theory and applications.
Advances in Applied Probability,
Vol. 24,
Issue. 3,
p.
604.
Chang, Cheng-Shang
Chao, Xiuli
Pinedo, Michael
and
Weber, Richard
1992.
On the optimality of LEPT and cµ rules for machines in parallel.
Journal of Applied Probability,
Vol. 29,
Issue. 3,
p.
667.
Chang, Cheng-Shang
and
Righter, Rhonda
1994.
The optimality of LEPT in parallel machine scheduling.
Journal of Applied Probability,
Vol. 31,
Issue. 03,
p.
788.
Pandelis, Dimitrios G.
and
Teneketzis, Demosthenis
1994.
Optimal Multiserver Stochastic Scheduling of two Interconnected Priority Queues.
Advances in Applied Probability,
Vol. 26,
Issue. 1,
p.
258.
Zhou, X.
and
Cai, X.
1997.
General stochastic single-machine scheduling with regular cost functions.
Mathematical and Computer Modelling,
Vol. 26,
Issue. 3,
p.
95.
Möhring, Rolf H.
Schulz, Andreas S.
and
Uetz, Marc
1999.
Approximation in stochastic scheduling.
Journal of the ACM,
Vol. 46,
Issue. 6,
p.
924.
Ahn, Hyun-Soo
Duenyas, Izak
and
Zhang, Rachel Q.
1999.
Optimal stochastic scheduling of a two-stage tandem queue with parallel servers.
Advances in Applied Probability,
Vol. 31,
Issue. 4,
p.
1095.
Möhring, Rolf H.
Schulz, Andreas S.
and
Uetz, Marc
1999.
Randomization, Approximation, and Combinatorial Optimization. Algorithms and Techniques.
Vol. 1671,
Issue. ,
p.
144.
Scharbrodt, Mark
Schickinger, Thomas
and
Steger, Angelika
2002.
A new average case analysis for completion time scheduling.
p.
170.
Altman, Eitan
2002.
Handbook of Markov Decision Processes.
Vol. 40,
Issue. ,
p.
489.
Uetz, Marc
2003.
When greediness fails: examples from stochastic scheduling.
Operations Research Letters,
Vol. 31,
Issue. 6,
p.
413.
Souza, Alexander
and
Steger, Angelika
2004.
STACS 2004.
Vol. 2996,
Issue. ,
p.
620.