Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Baxter, Laurence A.
1981.
A two‐state system with partial availability in the failed state.
Naval Research Logistics Quarterly,
Vol. 28,
Issue. 2,
p.
231.
Baxter, Laurence A.
1982.
Compound availability measures.
Naval Research Logistics Quarterly,
Vol. 29,
Issue. 3,
p.
403.
Kapur, P.K.
Natarajan, T.V.
and
Chakrabarty, Debashish
1983.
Availability measures for an intermittently used repairable system.
Microelectronics Reliability,
Vol. 23,
Issue. 5,
p.
841.
Baxter, Laurence A.
1983.
The moments of the forward recurrence times of an alternating renewal process.
European Journal of Operational Research,
Vol. 12,
Issue. 2,
p.
205.
Baxter, Laurence A.
1983.
Availability measures for coherent systems of separately maintained components.
Journal of Applied Probability,
Vol. 20,
Issue. 03,
p.
627.
Kapur, P.K.
Butani, N.L.
and
Bala, Renu
1984.
Generalised availability measures for a multi-unit repairable system with standby failure.
Microelectronics Reliability,
Vol. 24,
Issue. 4,
p.
637.
Kapur, P.K.
Butani, N.L.
and
Dutta, Debasis
1984.
Generalised availability measures for a two-unit intermittently used repairable system.
Microelectronics Reliability,
Vol. 24,
Issue. 1,
p.
29.
Baxter, Laurence A.
1985.
Some notes on availability theory.
Microelectronics Reliability,
Vol. 25,
Issue. 5,
p.
921.
Preuβ, W.
Kossow, A.
and
Kirchner, H.
1985.
Verschiedene Formeln zur Berechnung der instationären Intervallverfügbarkeit bei reparierbaren Betrachtungseinheiten technischer Systeme.
Zeitschrift für Operations Research,
Vol. 29,
Issue. 2,
p.
B17.
Baxter, Laurence A.
1985.
A case study in availability forecasting.
Microelectronics Reliability,
Vol. 25,
Issue. 5,
p.
927.
Gopalan, M.N.
and
Waghmare, S.S.
1986.
Cost-benefit analysis and joint availability measures.
Microelectronics Reliability,
Vol. 26,
Issue. 3,
p.
483.
Natarajan, R.
and
Shahul Hameed, M.A.
1986.
Some general measures for a complex n-unit standby redundant system.
Microelectronics Reliability,
Vol. 26,
Issue. 4,
p.
619.
Kapur, P.K.
and
Butani, N.L.
1986.
Availability measures for various multi-unit systems.
Microelectronics Reliability,
Vol. 26,
Issue. 6,
p.
1089.
Rossiter, M.H.
1989.
THE SOJOURN TIME DISTRIBUTION OF AN ALTERNATING RENEWAL PROCESS.
Australian Journal of Statistics,
Vol. 31,
Issue. 1,
p.
143.
KAPUR, P. K.
and
BHALLAJ, V. K.
1990.
Optimum maintenance policies maximizing service reliability.
International Journal of Systems Science,
Vol. 21,
Issue. 1,
p.
217.
Kapur, P.K.
Garg, R.B.
and
Bhalla, V.K.
1990.
Compound availability measures for a two-unit standby system.
Microelectronics Reliability,
Vol. 30,
Issue. 3,
p.
425.
Butani, N.L.
1991.
Generalized availability measures for reparable systems with preparation time for repair.
Microelectronics Reliability,
Vol. 31,
Issue. 1,
p.
43.
Hegde, G. G.
and
Karmarkar, Uday S.
1993.
Engineering costs and customer costs in designing product support.
Naval Research Logistics,
Vol. 40,
Issue. 3,
p.
415.
Csenki, A.
1994.
Joint availability of systems modelled by finite semi–markov processes.
Applied Stochastic Models and Data Analysis,
Vol. 10,
Issue. 4,
p.
279.
Abi-Zeid, Irène
and
Bobée, Bernard
1994.
Engineering Risk in Natural Resources Management.
p.
149.