Hostname: page-component-586b7cd67f-l7hp2 Total loading time: 0 Render date: 2024-11-27T02:22:24.474Z Has data issue: false hasContentIssue false

Recent Power Legislation in Quebec

Published online by Cambridge University Press:  07 November 2014

I. M. Biss*
Affiliation:
The University of Toronto
Get access

Abstract

Image of the first page of this content. For PDF version, please use the ‘Save PDF’ preceeding this image.'
Type
Notes and Memoranda
Copyright
Copyright © Canadian Political Science Association 1937

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

1 Established in 1907, Revised Statutes of Quebec, 1925, c. 17.

2 Cities and Towns Act, Revised Statutes of Quebec, 1925, c. 102, art. 456; and Municipal Code1 art 408.Google Scholar

3 25-26 Geo. V, c. 23.

4 Revised Statutes of Quebec, c. 46, s. 78.

5 1 Geo. V, c. 5.

6 25-26 Geo. V, c. 24.

7 See orders number 1, 6, 7, 13, 18, 22, 47, 55.

8 See orders number 9, 10, 29, 14, 18, 22.

9 See order number 11.

10 See orders number 3, 4, 10, 12, 14, 29.

11 Dr. Augustin Frigon, former president of the Quebec Electricity Commission, mimeographed copy of introductory Statement, Jan. 16, 1936, pp. 2 and 4.

12 For example, orders number 5, 7, 8, 9, 13, 18, 22, 47, 55.

13 Orders number 3, 4, 10, 12, 29.

14 Order number 30.

15 Dr. Frigon's statement cited above, p. 3, and orders number 5, 8, 9.

16 Frigon, op. cit., p. 3.

17 Ibid., p. 3.

18 Orders number 17, 19, 20, 21, and 23.

19 25-26 Geo. V, c. 49.

20 The advocates of a vigorous policy of nationalization had been disappointed by the failure of M. Duplessis to include Dr. Hamel in the Cabinet, and in February, 1937, the Hon. Oscar Drouin, minister of lands and forests, resigned after the rejection of his demand for a stronger policy (Monireal Gazette, Feb. 24, 25, and March 15).

21 Meanwhile the government had announced that it had reached, by direct negotiation, an agreement with the Quebec Power Company for a reduction of rates, no mention being made in the press report of any reference of the matter to Electricity Commission (see ibid., Nov. 21, 1936).

22 1 Geo. VI, c. 24.

23 The capital of the Hydro-Electric Power Commission of Ontario is $297,864,134.93 (Twenly-ninth annual report, p. xvii) and that of the Montreal Light, Heat and Power Consolidated is slightly over $100,000,000 ( Financial Post Survey of Corporate Securities, 1937, p. 45).Google Scholar

24 Revised Statutes of Quebec, 1925, c. 230, s. 106.

25 25-26 Geo. V, c. 23.

26 25-26 Geo. V, c. 49.

27 1 Geo. VI, c. 25.

28 Cf. Dr. Frigon's statement cited in footnote 16.

29 Dr. Frigon had resigned from the Quebec Electricity Commission at the end of 1936. In June, 1937, the death of the Hon. Honoré Mercier, chairman of the Streams Commission, compelled yet another change in personnel. He was succeeded by M. Horace Gagné, K.C.

30 1 Geo. VI, c. 26.

31 25-26 Geo. V, c. 49.

32 25-26 Geo. V, c. 49.