How was “risk” to the Fukushima Daiichi nuclear power plant calculated? Could risk projections run by successive cabinets and the Nuclear and Industrial Safety Agency predict internal cover-ups of safety defects or plant-owner TEPCO's shelving of arguments by scientists and anti-nuclear activists that securing the plant against tsunami up to 5.7 meters, a number that now seems woefully small given the 15 meter wave that struck on March 11, was inadequate?
Between 2012 and 2014 we posted a number of articles on contemporary affairs without giving them volume and issue numbers or dates. Often the date can be determined from internal evidence in the article, but sometimes not. We have decided retrospectively to list all of them as Volume 10, Issue 54 with a date of 2012 with the understanding that all were published between 2012 and 2014.' As footnote