Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Serfozo, Richard F.
1976.
Stochastic Systems: Modeling, Identification and Optimization, II.
Vol. 6,
Issue. ,
p.
202.
Pierskalla, William P.
and
Voelker, John A.
1976.
A survey of maintenance models: The control and surveillance of deteriorating systems.
Naval Research Logistics Quarterly,
Vol. 23,
Issue. 3,
p.
353.
Barnett, Arnold
and
Kleitman, Daniel J.
1978.
Some Optimization Problems with Bulk‐Service Queues.
Studies in Applied Mathematics,
Vol. 58,
Issue. 3,
p.
277.
Sim, S.H.
and
Templeton, J.G.C.
1982.
Queue-dependent vehicle dispatching with options and optimal fleet size.
Transportation Research Part B: Methodological,
Vol. 16,
Issue. 3,
p.
233.
Sim, S.H.
and
Templeton, J.G.C.
1983.
Computational procedures for steady-state characteristics of unscheduled multi-carrier shuttle systems.
European Journal of Operational Research,
Vol. 12,
Issue. 2,
p.
190.
Sennott, Linn I.
1989.
Average Cost Semi-Markov Decision Processes and the Control of Queueing Systems.
Probability in the Engineering and Informational Sciences,
Vol. 3,
Issue. 2,
p.
247.
Lee, Hyo-Seong
and
Srinivasan, Mandyam M.
1990.
The shuttle dispatch problem with compound Poisson arrivals: Controls at two terminals.
Queueing Systems,
Vol. 6,
Issue. 1,
p.
207.
Sim, S. H.
and
Templeton, J. G. C.
1990.
Further results for the M/M(a, ∞)/N batch-service system.
Queueing Systems,
Vol. 6,
Issue. 1,
p.
277.
Gurnani, H.
Anupindi, R.
and
Akella, R.
1991.
Control of batch processing systems.
p.
1772.
Glassey, C.R.
and
Weng, W.W.
1991.
Dynamic batching heuristic for simultaneous processing.
IEEE Transactions on Semiconductor Manufacturing,
Vol. 4,
Issue. 2,
p.
77.
Gurnani, H.
Anupindi, R.
and
Akella, R.
1992.
Control of batch processing systems in semiconductor wafer fabrication facilities.
IEEE Transactions on Semiconductor Manufacturing,
Vol. 5,
Issue. 4,
p.
319.
Aman, A.
Balakrishnan, A.
and
Chandru, V.
1992.
New Directions for Operations Research in Manufacturing.
p.
249.
Fowler, J.W.
Phillips, D.T.
and
Hogg, G.L.
1992.
Real-time control of multiproduct bulk-service semiconductor manufacturing processes.
IEEE Transactions on Semiconductor Manufacturing,
Vol. 5,
Issue. 2,
p.
158.
FOWLER, JOHN W.
HOGG, GARY L.
and
PHILLIPS, DON T.
1992.
CONTROL OF MULTIPRODUCT BULK SERVICE DIFFUSION/OXIDATION PROCESSES.
IIE Transactions,
Vol. 24,
Issue. 4,
p.
84.
Weng, W.W.
and
Leachman, R.C.
1993.
An improved methodology for real-time production decisions at batch-process work stations.
IEEE Transactions on Semiconductor Manufacturing,
Vol. 6,
Issue. 3,
p.
219.
Chandru, Vijaya
Lee, Chung-Yee
and
Uzsoy, Reha
1993.
Minimizing total completion time on a batch processing machine with job families.
Operations Research Letters,
Vol. 13,
Issue. 2,
p.
61.
CHANDRU, V.
LEE, C.-Y.
and
UZSOY, R.
1993.
Minimizing total completion time on batch processing machines.
International Journal of Production Research,
Vol. 31,
Issue. 9,
p.
2097.
Dshalalow, Jewgeni H.
1994.
First excess level analysis of random processes in a class of stochastic servicing systems with global control.
Stochastic Analysis and Applications,
Vol. 12,
Issue. 1,
p.
75.
Lee, Hyo-Seong
and
Kim, Sang Kuk
1994.
Optimal dispatching of an infinite capacity shuttle with compound poisson arrivals: Control at a single terminal.
Computers & Operations Research,
Vol. 21,
Issue. 1,
p.
67.
UZSOY, REHA
LEE, CHUNG-YEE
and
MARTIN-VEGA, LOUIS A.
1994.
A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART II: SHOP-FLOOR CONTROL.
IIE Transactions,
Vol. 26,
Issue. 5,
p.
44.