Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Natvig, Bent
1975.
On the waiting-time and busy period distributions for a general birth-and-death queueing model.
Journal of Applied Probability,
Vol. 12,
Issue. 03,
p.
524.
Daley, D. J.
1976.
Queueing output processes.
Advances in Applied Probability,
Vol. 8,
Issue. 02,
p.
395.
Natvig, Bent
1977.
On the reversibility of the input and output processes for a general birth-and-death queueing model.
Journal of Applied Probability,
Vol. 14,
Issue. 4,
p.
876.
Upton, Richard A
and
Tripathi, Satish K
1982.
An approximate transient analysis of the M(t)/M/1 queue.
Performance Evaluation,
Vol. 2,
Issue. 2,
p.
118.
Fakinos, D.
1982.
The M/G/k group-arrival group-departure loss system.
Journal of Applied Probability,
Vol. 19,
Issue. 4,
p.
826.
Fakinos, D.
1982.
The M/G/k group-arrival group-departure loss system.
Journal of Applied Probability,
Vol. 19,
Issue. 04,
p.
826.
Hunter, Jeffrey J.
1983.
Filtering of Markov renewal queues, II: Birth-death queues.
Advances in Applied Probability,
Vol. 15,
Issue. 02,
p.
376.
Pourbabai, B.
1988.
Tandem behavior of an M/M/1/N → G/M/1 queuing system.
Computers & Mathematics with Applications,
Vol. 16,
Issue. 3,
p.
215.
POURBABAI, BEHNAM
1989.
Optimal selection of the local storage sizes of an assembly system.
International Journal of Production Research,
Vol. 27,
Issue. 9,
p.
1625.
POURBABAI, BEHNAM
1990.
Optimal utilization of a finite capacity integrated assembly system.
International Journal of Production Research,
Vol. 28,
Issue. 2,
p.
337.
POURBABAI, BEHNAM
1992.
A DESIGN STRATEGY FOR ALLOCATION OF FACILITIES IN AN ASSEMBLY LINE SYSTEM FOR THROUGHPUT MAXIMIZATION AND BOTTLENECK CONTROL.
Engineering Optimization,
Vol. 19,
Issue. 1,
p.
21.
POURBABA, BEHNAM
1992.
OPTIMAL STRATEGIES FOR DESIGN AND OPERATION OF A FLEXIBLE MANUFACTURING SYSTEM.
Engineering Optimization,
Vol. 20,
Issue. 2,
p.
149.
Pourbabai, B.
1994.
An optimal policy for controlling the flow time in an assembly line system.
Optimization,
Vol. 30,
Issue. 2,
p.
177.
Manoharan, M.
Alamatsaz, M.H.
and
Shanbhag, D.N.
2003.
Stochastic Processes: Modelling and Simulation.
Vol. 21,
Issue. ,
p.
557.