9 - Capacity Market Supply

Published online by Cambridge University Press:  24 February 2022

Todd S. Aagaard
Affiliation:
Villanova University Charles Widger School of Law
Andrew N. Kleit
Affiliation:
Pennsylvania State University
Get access

Summary

The supply curve of a capacity market represents the aggregated bids of the suppliers of capacity. Different suppliers’ bids indicate their differing opportunity costs of incurring capacity obligations. Existing suppliers with firm plans to continue operating often bid at a price of zero, indicating that they are price-takers willing to accept a capacity obligation for any positive price. New suppliers and existing suppliers that are considering exiting the market, however, tend to bid at a non-zero price representing the additional revenue – that is, beyond the revenue they expect to earn from the energy and ancillary services markets – they need to receive to be able to operate without losing money.

For bidding to be possible, however, the object of the bidding – the capacity product – must first be defined. Defining the capacity product includes specifying how capacity is to be counted. This has turned out to be quite complicated. Centralized capacity markets are based on the premise that capacity is fungible, which allows a uniform capacity product to be traded in the market. In reality, however, different capacity resources make different contributions to overall system capacity. Factors such as the timing of generation and location of capacity are important. Regional transmission organizations (RTOs) operating capacity markets therefore must constantly balance two competing considerations that together constitute a complexity dilemma – creating a unified market that maximizes competition and minimizes transaction costs, versus creating a market that recognizes the different attributes of capacity resources.

Type
Chapter
Information
Publisher: Cambridge University Press
Print publication year: 2022

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

J References

Aagaard, TS and Kleit, AN (2019) The complexity dilemma in policy market design. Duke Environmental Law and Policy Forum 30, 1.Google Scholar
Carden, K, Wintermantel, N, and Krasny, A (2019) Capacity Value of Energy Storage in PJM. Prepared by Astrapé Consulting for the US Energy Storage Association and Natural Resources Defense Council (July 19).Google Scholar
Chen, X and Kleit, AN (2016) Money for nothing? Why FERC Order 745 should have died. Energy Journal 37, 201–21.Google Scholar
Cho, JH and Kleit, A (2015) Energy storage systems in energy and ancillary markets: a backwards induction approach. Applied Energy 147, 1176–83.Google Scholar
Cramton, P, Ockenfels, A and Stoft, S (2013) Capacity market fundamentals. Economics of Energy & Environmental Policy 2, 2746.Google Scholar
Crawford, VP and Knoer, EM (1981) Job matching with heterogeneous firms and workers. Econometrica 49, 437–50.Google Scholar
Coutu, R (2015) Clearing the ISO-NE Forward Capacity Auction (FCA): Functions of the FCA’s Descending Clock Auction and Market Clearing Engine, Holyoke, MA: ISO New England Inc. (December 12).Google Scholar
Denholm, P and Margolis, R (2018) The Potential for Energy Storage to Provide Peaking Capacity in California under Increased Penetration of Solar Photovoltaics, Golden, CO:National Renewable Energy Laboratory (March).Google Scholar
Densing, M (2020) The value of flexible selling: power production with storage for spinning reserve provision. European Journal of Operational Research 281, 141–51.Google Scholar
Department of Energy (2020). OE-417 Electric Emergency and Disturbance Report – Calendar Year 2019. Accessed at www.oe.netl.doe.gov/oe417_annual_summary.aspx.Google Scholar
Electric Power Research Institute (2007) Valuation of Renewable and Distributed Resources: Implications for the Integrated Resource Planning Process, Palo Alto, CA.Google Scholar
Energy Information Administration (EIA) (2020a) Battery Storage in the United States: An Update on Market Trends (July 15).Google Scholar
Energy Information Administration (EIA) (2020b) Glossary. Accessed at www.eia.gov/tools/glossary/.Google Scholar
Federal Energy Regulatory Commission (FERC) (2000) PPL Electric Utilities Corporation, Order rejecting cancellation of rate schedule, 92 FERC ¶ 61,057 (July 26).Google Scholar
Federal Energy Regulatory Commission (FERC) (2001) New York Independent System Operator, Inc., Order accepting tariff revisions and directing translation of the in-city price cap, 96 FERC ¶ 61,251 (September 4).Google Scholar
Federal Energy Regulatory Commission (FERC) (2006a) Devon Power L.L.C., Order accepting proposed settlement agreement, 115 FERC ¶ 61,340 (June 16).Google Scholar
Federal Energy Regulatory Commission (FERC) (2006b) PJM Interconnection, L.L.C., Order denying rehearing and approving settlement subject to conditions, 117 FERC ¶ 61,331 (December 22).Google Scholar
Federal Energy Regulatory Commission (FERC) (2011a) Demand response compensation in organized wholesale energy markets (Order 745). Federal Register 76, 16,65882 (March 24).Google Scholar
Federal Energy Regulatory Commission (FERC) (2011b) PJM Interconnection, L.L.C., Order on compliance filing, rehearing, and technical conference, 137 FERC ¶ 61,145 (November 17).Google Scholar
Federal Energy Regulatory Commission (FERC) (2012) PJM Interconnection, L.L.C., Order on compliance filing, 139 FERC ¶ 61,057 (April 19).Google Scholar
Federal Energy Regulatory Commission (FERC) (2013) New York Independent System Operator, Inc., Order accepting proposed tariff revisions and establishing a technical conference, 144 FERC ¶ 61,126 (August 13).Google Scholar
Federal Energy Regulatory Commission (FERC) (2014) ISO New England Inc. and New England Power Pool, Order on tariff filing and instituting Section 206 proceeding, 147 FERC ¶ 61,172 (May 30).Google Scholar
Federal Energy Regulatory Commission (FERC) (2015) PJM Interconnection, L.L.C., Order on proposed tariff revisions, 151 FERC ¶ 61,208 (June 9)Google Scholar
Federal Energy Regulatory Commission (FERC) (2016) ISO New England Inc., Order accepting market rule changes and requiring informational report, 157 FERC ¶ 61,025 (October 18).Google Scholar
Federal Energy Regulatory Commission (FERC) (2018) Electric storage participation in markets operated by regional transmission organizations, and independent system operators (Order 841). Federal Register 83, 9580–633 (March 6).Google Scholar
Federal Energy Regulatory Commission (FERC) (2019) PJM Interconnection, L.L.C., Order on compliance filing, instituting section 206 proceeding, and establishing paper hearing, 169 FERC ¶ 61,049 (October 17).Google Scholar
Federal Energy Regulatory Commission (FERC) (2020a) PJM Interconnection, L.L.C., Order on compliance filing, establishing paper hearing procedures, consolidating and holding proceedings in abeyance, 171 FERC ¶ 61,015 (April 10).Google Scholar
Federal Energy Regulatory Commission (FERC) (2020b) Old Dominion Electric Cooperative v. PJM Interconnection, L.L.C., Order denying complaints, 71 FERC ¶ 61,149 (May 21).Google Scholar
Federal Energy Regulatory Commission (FERC) Staff (2013) Centralized Capacity Market Design Elements (Staff Report No. AD13-7-000, August 23).Google Scholar
Goldberg, ML and Agnew, GK (2013) Measurement and Verification for Demand Response, Washington, DC: Department of Energy (February).Google Scholar
Gramlich, R and Goggin, M (2019) Too Much of a Wrong Thing: The Need for Capacity Market Replacement or Reform. Prepared by Grid Strategies LLC for Sustainable FERC Project (November).Google Scholar
Hibbard, P, Schatzki, T, and Bolthrunis, S (2017) Capacity Resource Performance in NYISO Markets: An Assessment of Wholesale Market Options, Boston, MA: Analysis Group Inc. (October).Google Scholar
Hogan, M and Littell, D (2020) Get What You Need: Reclaiming Consumer-Centric Resource Adequacy, Montpelier, VT: Regulatory Assistance Project (June).Google Scholar
Holmberg, D, Hardin, D, and Koch, E (2013) Towards demand response measurement and verification standards. Proceedings of 2012 Grid Interop, Irving, TX, December 3–6, 2012.Google Scholar
ISO New England Inc. (2020a) 2020–2029 Forecast Report of Capacity, Energy, Loads and Transmission (April 30). Accessed at www.iso-ne.com/system-planning/system-plans-studies/celt.Google Scholar
ISO New England Inc. (2020b) Forward Capacity Auction Obligations (February 18). Accessed at https://bit.ly/3C1NW8g.Google Scholar
ISO New England Inc. (2020c) FCM Annual System Peak Day, Hour, and Load. Accessed at https://bit.ly/3aUa2gW.Google Scholar
ISO New England Inc. (2020d) Transmission, Markets, and Services Tariff: Market Rule 1 (Standard Market Design), Holyoke, MA.Google Scholar
Kleit, A (2018) Modern Energy Market Manipulation, Somerville, MA: Emerald.Google Scholar
Mankiw, NG (2012) Principles of Microeconomics, 7th edn, Stamford, CT: Cengage.Google Scholar
Monitoring Analytics, LLC (2020) State of the Market Report for PJM: Volume 2: Detailed Analysis, Eagleville, PA.Google Scholar
Murphy, S, Apt, J, Moura, J, and Sowell, F (2018) Resource adequacy risks to the bulk power system in North America. Applied Energy 212, 1360–76.Google Scholar
North American Electric Reliability Corporation (NERC) (2011) Methods to Model and Calculate Capacity Contributions of Variable Generation for Resource Adequacy Planning, Princeton, NJ (March).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2013) New York Independent System Operator, Inc., Proposed tariff revisions to establish and recognize a new capacity zone and request for action on pending compliance filing, FERC Docket No. ER13-1380 (April 30).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2016) Proposed NYISO Installed Capacity Demand Curves for Capability Year 2017/2018 and Annual Update Methodology and Inputs for Capability Years 2018/2019, 2019/2020, and 2020/2021, Rensselaer, NY (September 15).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2019a) ICAP Translation of Demand Curve (Summer 2019), Rensselaer, NY (March 18).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2019b) ICAP Translation of Demand Curve (Winter 2019/2020), Rensselaer, NY (September 17).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2019c) Reliability and Market Considerations for a Grid in Transition, Rensselaer, NY (May).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2020a) Manual 4: Installed Capacity Manual, Rensselaer, NY (Revision 6.46, April).Google Scholar
New York Independent System Operator, Inc. (NYISO) (2020b) 2020 Load & Capacity Data. Accessed at https://bit.ly/3vq4y7b.Google Scholar
New York Independent System Operator, Inc. (NYISO) (2020c) Monthly Auction Summary. Accessed at http://icap.nyiso.com/ucap/public/auc_view_monthly_detail.do.Google Scholar
New York Independent System Operator, Inc. (NYISO) (n.d.) Locational Minimum Installed Capacity Requirements Determination Process, Rensselaer, NY.Google Scholar
New York Public Service Commission (2013) New York Independent System Operator, Inc., Notice of intervention and protest, FERC Docket No. ER13-1380 (May 21).Google Scholar
Nuclear Regulation Commission (NRC) (2020) Glossary. Accessed at: www.nrc.gov/reading-rm/basic-ref/glossary.html.Google Scholar
PJM Interconnection, L.L.C. (2007) Base Residual Auction Optimization Formulation, Norristown, PA (December 12).Google Scholar
PJM Interconnection, L.L.C. (2016) Load Management Performance Report 2015/2016, Norristown, PA (August).Google Scholar
PJM Interconnection, L.L.C. (2017) Class Average Capacity Factors: Wind and Solar Resources (June 1). Accessed at https://bit.ly/3AW7V6Q.Google Scholar
PJM Interconnection, L.L.C. (2017) Price Responsive Demand Fact Sheet, Norristown, PA (March 23).Google Scholar
PJM Interconnection, L.L.C. (2018a) Commitments by Fuel Type & Delivery Year 2007/08 – 2021/22 (May 23). Accessed at www.pjm.com/markets-and-operations/rpm.aspx.Google Scholar
PJM Interconnection, L.L.C. (2018b) Strengthening Reliability: An Analysis of Capacity Performance, Norristown, PA (June 20).Google Scholar
PJM Interconnection, L.L.C. (2019a) PJM Manual 18B: Energy Efficiency Measurement & Verification, Norristown, PA (August 22, Revision 04).Google Scholar
PJM Interconnection, L.L.C. (2019b) PJM Manual 21: Rules and Procedures for Determination of Generating Capability, Norristown, PA (August 1, Revision 14).Google Scholar
PJM Interconnection, L.L.C. (2019c) Top 10 All Time Summer/Winter Peak Load Days. Accessed at www.pjm.com/markets-and-operations/ops-analysis.aspx.Google Scholar
PJM Interconnection, L.L.C. (2020a) Load Management Performance Report 2019/2020, Norristown, PA.Google Scholar
PJM Interconnection, L.L.C. (2020b) PJM 2015–2019 Weighted Average EFORd by Fuel Type (June 1). Accessed at https://bit.ly/3jf8ra6.Google Scholar
PJM Interconnection, L.L.C. (2020c) PJM Manual 18: PJM Capacity Market, Norristown, PA (Revision 45, May 28).Google Scholar
PJM Interconnection, L.L.C. (2020d) PJM Open Access Transmission Tariff, Norristown, PA.Google Scholar
Zhao, F and Litvinov, E (2010) Defining and pricing capacity product in capacity markets. IEEE PES General Meeting, Providence, RI, 2010, pp. 16.Google Scholar

Save book to Kindle

To save this book to your Kindle, first ensure [email protected] is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.

Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.

Find out more about the Kindle Personal Document Service.

Available formats
×

Save book to Dropbox

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.

Available formats
×

Save book to Google Drive

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.

Available formats
×