Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by
Crossref.
Absi, Nabil
2008.
Models and methods for capacitated lot-sizing problems.
4OR,
Vol. 6,
Issue. 3,
p.
311.
Shaorui Li
and
Mikio Kubo
2008.
The capacitated production planning problem with sequence-dependent changeovers.
p.
2363.
Tomasgard, Asgeir
2009.
Comments on: On a mixture of the fix-and-relax coordination and Lagrangean substitution schemes for multistage stochastic mixed integer programming.
TOP,
Vol. 17,
Issue. 1,
p.
30.
Absi, Nabil
and
Kedad-Sidhoum, Safia
2009.
The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs.
Computers & Operations Research,
Vol. 36,
Issue. 11,
p.
2926.
Shaorui Li
and
Kubo, M.
2009.
Modeling and Solving the Practical Production Planning Problem.
p.
142.
Tao Wu
Leyuan Shi
and
Duffie, Neil A
2010.
An HNP-MP Approach for the Capacitated Multi-Item Lot Sizing Problem With Setup Times.
IEEE Transactions on Automation Science and Engineering,
Vol. 7,
Issue. 3,
p.
500.
Yao, Chen
and
Cassandras, Christos.G.
2010.
A solution of the lot sizing problem as a stochastic resource contention game.
p.
6728.
Okhrin, Irena
and
Richter, Knut
2011.
An O(T3) algorithm for the capacitated lot sizing problem with minimum order quantities.
European Journal of Operational Research,
Vol. 211,
Issue. 3,
p.
507.
Lang, Jan Christian
and
Shen, Zuo-Jun Max
2011.
Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions.
European Journal of Operational Research,
Vol. 214,
Issue. 3,
p.
595.
James, Ross J.W.
and
Almada-Lobo, Bernardo
2011.
Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics.
Computers & Operations Research,
Vol. 38,
Issue. 12,
p.
1816.
Santos, Maristela Oliveira
and
Almada-Lobo, Bernardo
2012.
Integrated pulp and paper mill planning and scheduling.
Computers & Industrial Engineering,
Vol. 63,
Issue. 1,
p.
1.
Wu, Tao
Shi, Leyuan
and
Song, Jie
2012.
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times.
Annals of Operations Research,
Vol. 196,
Issue. 1,
p.
635.
Chen Yao
and
Cassandras, C. G.
2012.
A Solution to the Optimal Lot-Sizing Problem as a Stochastic Resource Contention Game.
IEEE Transactions on Automation Science and Engineering,
Vol. 9,
Issue. 2,
p.
250.
Wu, Tao
Shi, Leyuan
Geunes, Joseph
and
Akartunalı, Kerem
2012.
On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times.
Journal of Global Optimization,
Vol. 53,
Issue. 4,
p.
615.
Absi, Nabil
Detienne, Boris
and
Dauzère-Pérès, Stéphane
2013.
Heuristics for the multi-item capacitated lot-sizing problem with lost sales.
Computers & Operations Research,
Vol. 40,
Issue. 1,
p.
264.
Wu, Tao
Zhang, Canrong
Liang, Zhe
and
Leung, Stephen C.H.
2013.
A Lagrangian relaxation-based method and models evaluation for multi-level lot sizing problems with backorders.
Computers & Operations Research,
Vol. 40,
Issue. 7,
p.
1852.
Xiao, Jing
Zhang, Canrong
Zheng, Li
and
Gupta, Jatinder N. D.
2013.
MIP-based fix-and-optimise algorithms for the parallel machine capacitated lot-sizing and scheduling problem.
International Journal of Production Research,
Vol. 51,
Issue. 16,
p.
5011.
Uggen, Kristin Tolstad
Fodstad, Marte
and
Nørstebø, Vibeke Stærkebye
2013.
Using and extending fix-and-relax to solve maritime inventory routing problems.
TOP,
Vol. 21,
Issue. 2,
p.
355.
Cassandras, Christo
and
Yao, Chen
2014.
Formal Methods in Manufacturing.
Vol. 20144163,
Issue. ,
p.
105.
Adacher, Ludovica
and
Cassandras, Christos G.
2014.
Lot size optimization in manufacturing systems: The surrogate method.
International Journal of Production Economics,
Vol. 155,
Issue. ,
p.
418.