No CrossRef data available.
Article contents
OPTIMISATION OF WELDED BEAMS: HOW COST FUNCTIONS AFFECT THE RESULTS
Published online by Cambridge University Press: 11 June 2020
Abstract
The increasing market competitiveness and CAE availability require the products to be optimised. This practice is exceedingly present when producing semi-standard parts like structural elements. Several cost calculation methods are developed, bringing up the question - which one to use? In this article, we compared three methods; a welded I-section beam was used as an example. The optimisation was carried out using two objectives (mass and cost) and was submitted to Eurocode boundary conditions. The results have shown that the cost calculation method has a negligible influence on the results.
- Type
- Article
- Information
- Creative Commons
- This is an Open Access article, distributed under the terms of the Creative Commons Attribution-NonCommercial-NoDerivatives licence (http://creativecommons.org/licenses/by-nc-nd/4.0/), which permits non-commercial re-use, distribution, and reproduction in any medium, provided the original work is unaltered and is properly cited. The written permission of Cambridge University Press must be obtained for commercial re-use or in order to create a derivative work.
- Copyright
- The Author(s), 2020. Published by Cambridge University Press