Hostname: page-component-586b7cd67f-rdxmf Total loading time: 0 Render date: 2024-11-26T18:55:01.944Z Has data issue: false hasContentIssue false

Modelling the interaction between the atmosphere and curing concrete bridge decks with the SLABS model

Published online by Cambridge University Press:  02 July 2003

Gary S Wojcik
Affiliation:
Atmospheric Sciences Research Center, University at Albany, State University of New York, 251 Fuller Road, Albany, NY 12203-3649 email: [email protected]
David R Fitzjarrald
Affiliation:
Atmospheric Sciences Research Center, University at Albany, State University of New York, 251 Fuller Road, Albany, NY 12203-3649 email: [email protected]
Joel L Plawsky
Affiliation:
Department of Chemical Engineering, Rensselaer Polytechnic Institute, Troy, NY 12180-3590
Get access

Abstract

The interaction between atmospheric and construction conditions and the exothermic, temperature-dependent hydration reactions of the concrete's binding components may produce adverse conditions in curing concrete, thereby reducing the quality of that concrete. Accurate model forecasts of concrete temperatures and moisture would help engineers determine an optimal time to pour, an optimal mix design, and/or optimal curing practices. Existing models of curing concrete bridge decks and road surface prediction models lack realistic boundary conditions. The concrete models contain unnecessarily detailed hydration heat generation mechanisms for a simplified field forecast model. In this paper, a new energy balance model (SLABS), which can be easily adapted to predict road surface conditions, is described and applied to predict the temperatures and moisture of curing concrete bridge decks made with New York State Department of Transportation's Class HP concrete. Highest concrete temperatures occurred at high air temperatures, humidities and initial concrete temperatures and at low cloud cover fractions and wind speeds. Peak concrete temperatures can exceed 60°C. To minimise concrete temperatures and temperature gradient magnitudes, concrete should be placed during the late afternoon or early evening. As a field forecast model for which the meteorological inputs are taken from NGM MOS forecasts, the outputs of SLABS include the peak concrete temperature (to within 2°C of the observed in one application), peak temperature gradient, evaporation rate at the time of placement and several warning messages indicating adverse field conditions.

Type
Research Article
Copyright
© 2003 Royal Meteorological Society

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)