INTRODUCTION

This chapter aims to put decommissioning on the Norwegian Continental Shelf (NCS) into a historic and factual perspective. In addition it intends to present the basic regulatory framework governing decommissioning and to provide some comments on the future of decommissioning on the NCS. It is thus not its purpose to present and review the details of Norwegian decommissioning law.

The chapter is structured as follows: section 2 starts with a brief overview of the history of oil and gas exploration and production on the NCS and also provides some facts and figures with regard to decommissioning. This is followed in section 3 by an introduction to Norwegian decommissioning law, which includes public law and the contractual regime between licensees. Finally, section 4 will provide some thoughts on the future of decommissioning on the NCS.

DECOMMISSIONING ON THE NCS: BRIEF HISTORIC AND FACTUAL BACKGROUND

Petroleum activities started on the NCS in 1965 with the award of the first production licences. The first discovery was made early in 1967, but it was not until the end of 1969 that the first commercial discovery was made. This was the Ekofisk-field, which started producing in 1972 and which is still producing. Since then more than 1000 production licences have been awarded, of which approximately 600 are still active today. There are 41 companies holding licence interests in these licences.

Even if less than half the expected recoverable resources on the NCS have been produced, the NCS is a mature petroleum province. Currently there are around 85 fields producing, as well as some 8000 km of gas export pipelines. There are close to 500 installations on the NCS, and among these are 12 concrete installations, 23 steel floating installations and 59 steel installations resting on the seabed. In addition, there are close to 400 subsea installations. The 12 concrete installations represent approximately 70 per cent of the total weight of all installations on the NCS. Many of these installations are approaching the end of their expected lifetime. However, production and installation lifetime has in many cases been extended substantially due to the tie-in of satellite fields and improved recovery.

Type
Chapter
Information
Publisher: Intersentia
Print publication year: 2020

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Save book to Kindle

To save this book to your Kindle, first ensure [email protected] is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.

Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.

Find out more about the Kindle Personal Document Service.

Available formats
×

Save book to Dropbox

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.

Available formats
×

Save book to Google Drive

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.

Available formats
×